ncrawley
ncrawley ncrawley
  • 06-06-2021
  • Mathematics
contestada

The time it takes to build a house (T), varies directly with the floor area (A), and inversely with the number of workers (W). What is the equation that models this situation?

Respuesta :

Аноним Аноним
  • 06-06-2021

Answer:

T = k * (A/W)

Step-by-step explanation:

Answer Link

Otras preguntas

The equation of a line is x + 5y = 12. What is the y-intercept of the line?
what is 10 times as much as 60000
In chapter 12 of the book of Exodus, God gave Moses some specifications for the celebration of the Passover. Name three of these specifications.
turn this sentence into an algebraic equation: ann has 5 newest music CD's which is 3 less than twice the amount that bob has
divide $174.90 by $795.00
The difference between the square roots of a number is 30. What is the number? Explain.
In chapter 12 of the book of Exodus, God gave Moses some specifications for the celebration of the Passover. Name three of these specifications.
How do you simplify 2i<6u ?
write paradoxical statements for all 3
draw and shade a figure that represents 100%