drakester2004 drakester2004
  • 06-09-2021
  • Engineering
contestada

Deviations from the engineering drawing cannot be made without the approval of the
A. contractor
B. architect
C. engineer
.D. foreman

Respuesta :

manamoto13 manamoto13
  • 06-09-2021

Answer:

a. contractor

Explanation:

The contractor has to approve or give the sign for the drawings to be made, otherwise you can't do anything.

Answer Link
teddiarsa
teddiarsa teddiarsa
  • 06-09-2021

Answer:

it's option a. contractor

Explanation:

did the same quiz

Answer Link

Otras preguntas

With the gloaming came the cry of the many neighborhood barred owls, announcing their territories. Which resource would most likely help you figure out the mean
Which statement correctly contrasts an initiative and a referendum in Michigan
is Susan watches 3 hours of TV daily how many hours of TV does she watch in December
Which of the following is a binomial? A. b²-14 B. x² C. s⁴-s+12 D. f³+f²-f+16
Show the empirical formula manganese fluoride; 59.1% Mn and 40.9% F. Fill in the subscripts on the formula below. Make sure to have a whole number of each subsc
How is multiplying a whole number by a mixed number the same as multiplying two mixed numbers?
What is the pH of a 0.65 M solution of pyridine, C5H5N?
can you help me solve each compound inequality and graph it's solution? 2 and 4 please and thank you
can anyone answer this for pleas. Helppppppp pleass!!!!!
Refer to Explorations in Literature for a complete version of this narrative. Read this excerpt from "Mother Tongue" by Amy Tan. But it wasn’t until 1985 that I