erikad80
erikad80 erikad80
  • 07-10-2021
  • Mathematics
contestada

A group of workers can plant 21 acres in 7 days.
What is their rate in acres per day?

Respuesta :

wwwchivova
wwwchivova wwwchivova
  • 07-10-2021

Answer:

3

Step-by-step explanation:

21 acres divided by 7 days equals to 3 days

Each day they do 3 acres

3 acres * 7 days = 21 acres in a week

Answer Link
jaclynlee0501 jaclynlee0501
  • 07-10-2021

Answer:

I think 3 acers in a day. if you need an explanation pls let me know :)

Answer Link

Otras preguntas

continental crust is primarily witch kind of rock
What is a web diagram?
$48 marked down by 20%
An isosceles triangle has one angle with a measure of 30°. What could the measure of the other two angles be?    30° and 120°    30° and 30°    75° and 75°
How do you evaluate what a speaker says?
What does the term heat death refer to? a. a danger of increasing entropy b. the hot and fiery end to the universe c. the unavailability of energy to do work
why would the church and religious life have fun such great appeal
What is the degree of the polynomial 4x2 - 6x + 1? A. 4 B. 2 C. 6 D. 1
If 5 moles of Fe2O3 react with excess CO, what is the maximum amount of age and CO2 that can be formed?
A system of two linear equations is graphed. The lines have the same slope, but different intercepts. How many solutions does the system have? A. 0 B. 1 C. 2 D.